Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 8.5/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
DJR-S New Aluminum Alloy Pectination Block Heater
Product description
1.Insulating resistance:more than10M
2.Electric strength: more than 2000V
3.Useful time: more than 5000hours
4.Rating power: 50~500W±10%
5.Voltage: AC380V,220V,DC220V,DC110
6.It's made of heat sink of aluminum alloy and heating wire of high quality alloy.
7.Features: small cubage, beautiful apprence, thermolysis uniformity, Fast heat conduction.
8.Useful time is longer than tubular heater and it has long working time.
9.It is used for Switchgear.
10.According to customer request to make a modify
11.If you have any request, please do not hesitate to contact us. We will provide a reasonable quotation and best quality products.Thank you for your attention.
thermolysis uniformity
Main technical parameter:
Electric strength |
More than 2000v |
Insulation resistance |
More than 10M |
Service time |
More than 5000hours |
Rated power |
50~500W±10% |
Operation voltage |
AC380V,220V,DC220V,DC110 |
FAQ
Q: Could I have prices of your products?
A: Welcome. Please feel free to send us inquiry here. We will reply you within 24 hours.
Q: Can I get a sample before the bulk order?
A: Yes, we welcome sample order to test and check quality.Mixed samples are acceptable.
Q: Can we print our logo/ company name on products?
A: Yes, of course, we accept OEM, then need you to provide brand authorization to us
Q:Do you accept product customization?
A:Yes, of course, please provide specific drawings or parameters, we will quote you after evaluation
Q: What is the lead time?
A: The lead time depends on the quantities ordered, generally within 7-20 days after receiving the payment.
Q: What is your Trade Terms?
A: We accept EXW, FOB, CIF, FCA, etc.
Q: What is your payment method?
A: We accept T/T, Western Union, Paypal, irrevocable L/C at sight, etc
Q: Do you inspect the finished products?
A: Yes, each step of production and finished products will be came out inspection by QC department before shipping. And we will provide goods inspection reports for your reference before shipment
Q: How to solve the quality problems after sales?
A: Take photos of the quality problems and send to us for our checking and confirming, we will make a satisfied solution for you within 3 days.